Should you replace the roof before solar in San Diego?

Yes — if the roof will not outlast the system. In San Diego that usually means the underlayment and flashing, not how the tiles look from the street. We inspect first, then do the roof, the array, and the battery under one license.

Call now (858) 541-1097Get a free estimate

Licensed & Insured · CSLB #1130793 (B / C-10 / C-39) · GAF Certified · Tesla Certified · Enphase Certified

A solar system is a 25-year decision sitting on a roof that may have five years left. If you put panels on tired underlayment, you pay twice: once to install, again to detach, reroof, and reset.

McKay Roofing and Solar holds CSLB #1130793 with B, C-10 and C-39 classifications. The roof and the electrical stay with one contractor. We tell you whether the roof needs a repair, a tile lift-and-relay, or a full replacement before anything is mounted.

Office: 9520 Padgett St, Suite 107, San Diego, CA 92126.

How we decide: repair, lift-and-relay, or replace

We get on the roof. We do not guess from the driveway.

Repair when the leak or damage is local, the field is sound, and the remaining life still covers the solar warranty window. Typical: a few cracked tiles, a dried-out pipe jack, one valley that is open.

Tile lift-and-relay when the tiles themselves are fine but the underlayment is cooked. That is common in El Cajon, Rancho San Diego, and anywhere the tile has outlived the felt underneath. Tiles come off, new underlayment goes down, tiles go back. Then solar mounts into a roof that can actually take them.

Full replacement when the covering is at the end of its life, leaks keep moving, or the deck is soft. Shingle roofs in the 15–25 year range around La Mesa, Spring Valley and Mission Valley hit this point often. So do old cap-sheet flats.

If the roof will not reasonably last with the array on it, we say so. We would rather lose a solar sale than put panels on a roof we will have to open again.

See roof repair, roof replacement, and roofing materials.

What goes wrong when panels go on a tired roof

The leak is rarely under the middle of a panel. It is at a flashing, a pipe, a wall, or a mount that was set into brittle material.

Then you have two companies. The solar company says the roof was already bad. The roofer says the mounts were wrong. Insurance stalls. The homeowner pays for a detach-and-reset that should have been a single job.

City of San Diego rules for taking existing PV off for a reroof are specific: reinstall of the same system, original plan set, and the PV work done by a contractor with C-10 or C-46. We already hold C-10 and C-39 on the same license, so that seam is ours. Details and source links live on Does a reroof end NEM 2.0 grandfathering?

Tile roofs in East County

Tile looks permanent from the street. Heat hits the underlayment first.

If you are in El Cajon, Lakeside, Jamul or Rancho San Diego and someone wants to lag mounts through 20-year-old felt, stop. Have the underlayment checked. Tile is often a better solar roof than tired shingles — once the layer underneath is right.

More on that: Can you install solar on a tile roof in El Cajon? and our El Cajon service area.

Shingle, flat and TPO

Shingle is the common case west and south of the 15. If the field is bald, cupped, or already patched in three places, do not buy a 25-year array to sit on a 5-year roof. Cost context: roof replacement cost in San Diego.

Flat and torch-down are a different problem. Water sits. Seams open. A solar rack on a blistered cap sheet is a future interior leak. We do tear-off and new modified bitumen or TPO, then plan the array. Project examples: torch-down tear-off in San Diego and TPO with solar.

Already have solar and the roof is failing

That is a detach-and-reset, not a new sales pitch.

We inventory modules and inverters before anything comes off. Same count, same layout goes back unless you make a separate decision to change equipment. Adding panels or swapping an inverter during a reroof is how grandfathering gets put at risk. We keep that conversation separate and documented.

If a national installer went dark and you need the roof opened anyway, start with an inspection. We already publish that path for closed brands in our closed contractor directory.

Batteries and net billing

New systems in SDG&E territory are on net billing, not old retail-credit net metering. Exported power is worth much less than power you use between 4pm and 9pm. That is why we talk battery in the same visit as the roof — Tesla Powerwall or Enphase IQ Battery, whichever fits the house.

Roof first. Then array. Then storage. One plan.

What an inspection actually includes

  • Walk the roof: covering, underlayment clues, flashing, penetrations, drainage
  • Photos of problem areas, not just the pretty elevation
  • Whether mounts can land on sound structure
  • Whether existing solar (if any) can come off and go back like-for-like
  • A straight recommendation: repair, lift-and-relay, replace, or leave it

Estimates for work are free. We also offer a paid inspection report that is credited if you hire us for the job. Call (858) 541-1097 or use the quote form.

Serving San Diego County

Spring Valley, La Mesa, El Cajon, Santee, Lemon Grove, Chula Vista, National City, Lakeside, Bonita, Rancho San Diego, Jamul, Mission Valley, Mira Mesa and the rest of the county. If you are not sure we run that far, ask. Full list on our service area page.

Common questions about roof-before-solar

Do I have to replace my roof before installing solar in San Diego?

Not always. You have to know what life is left. If the covering and underlayment will not last with the system on them, replace or relay first. We inspect the roof before designing the array.

Can you install solar on a tile roof in San Diego?

Yes. Tile roofs can take solar when the underlayment and structure are sound. Heat in East County often cooks the felt before the tile fails, so we check the underlayment first. See our El Cajon tile guide.

Does a reroof end NEM 2.0 grandfathering?

A like-for-like detach and reset does not by itself increase generating capacity. Adding panels or changing inverters can. SDG&E determines tariff eligibility, not us — we document the array before it comes off. Read the grandfathering page and confirm with SDG&E.

Do you remove and reinstall existing solar panels for a new roof?

Yes. We inventory modules and inverters, replace the roof, and put the same system back under CSLB license #1130793, which includes C-39 roofing and C-10 electrical.

How long does the roof-then-solar sequence take?

Roof work is scheduled first. Solar and battery follow once the covering is on and inspections are clear. Tile and detach-and-reset jobs take longer than a simple shingle reroof. We give you the sequence before we start.

Who holds the warranty if it leaks later?

We do. One license, one contractor for the roof and the electrical. That is the point.

Request a roof-first solar estimate

McKay Roofing and Solar
9520 Padgett St, Suite 107, San Diego, CA 92126
(858) 541-1097
CSLB #1130793 · B / C-10 / C-39

Get a free estimate. We will look at the roof before we talk panel count.

Call (858) 541-1097Request an estimate

McKay Roofing and Solar

San Diego Office

9520 Padgett St, Suite 107, San Diego, CA 92126

Licensed & Insured

License #1130793

Contact Information

Hours

Mon - Fri: 7am - 4:30pm

Sat: Closed

Sun: Closed